Projects at the stage of competitive selection

The projects were submitted for participation in the competitive selection of projects of the State Regional Development Fund

"Reconstruction of the emergency section of the water supply from the VNS II riser to the switching chamber on the street Rynkova in the city of Kalush, Ivano-Frankivsk region". The total amount of the project is 10,601,635 thousand UAH., of which UAH 9,530,870,000 are DFRD funds and UAH 1,070,765,000. - from the budget of the Kalush city community. The work project envisages the reconstruction of the emergency section of the water supply from VNS II rise to the switching chamber on the street Rynkova in the city of Kalush, Ivano-Frankivsk region. According to the design assignment, the construction of this water pipeline is foreseen in two phases. The 1st phase of construction - from the point of insertion No. 2 on the existing water pipeline with a diameter of 600 mm on L. Ukrainka Ave. to the point of connection to the existing water pipeline with a diameter of 1000 mm in the area of ​​Malytska Street (node ​​"A"), 370 m long and the 2nd phase of construction - from this node "A" to the place of cut-in No. 1 in the existing chamber at the exit from the pumping station II of the lift with a length of 610 m. The purpose of the project is to provide high-quality water supply to residential buildings of microdistricts, institutions, enterprises and organizations of the Kalush urban territorial community on a continuous basis. The existing steel water pipe with a diameter of 1000 mm is in an emergency condition. According to the calculation, polyethylene pipes (PE10) with a diameter of 630x37.4 mm are provided for the laying of the water pipeline in the area from the emergency room of the 2nd ascent to the designed well at the place of insertion No. 2 into the existing steel water pipeline with a diameter of 600 mm on the territory of the gas station. Due to the wear and tear of the pipes, there are frequent surges, there are systematic interruptions in the water supply, which negatively affects the quality of water supply services, and can cause the quality of tap water to be inconsistent with the relevant sanitary standards and create a threat of epidemic situations. In addition, due to frequent repair work, the maintenance and service costs of the water supply network increase significantly, which affects the cost of drinking water. During the elimination of emergency situations of the sewage network, the microdistrict remains without water, which negatively affects the sanitary and living conditions of residents and destabilizes the social situation in the city. During 2021, 85% of construction works were completed on the facility, which were financed from the state, regional and urban territorial community budgets of the city of Kalush. For 2022, the financing plan provides funds from the urban territorial community budget for the completion of the works, but due to the introduction of martial law in Ukraine, the State Treasury Service does not make payments for completed works. 

"Reconstruction of the water supply on the street District in the city of Kalush, Ivano-Frankivsk region"

  

During 2021, a recalculation of the estimated cost of the facility was developed. The total amount of the project is UAH 6,607,807 thousand.For the year 2022, the financing plan provides funds from the budget of the city territorial community for co-financing, but due to the introduction of martial law in Ukraine, the State Treasury Service does not make payments for the completed works. The work project provides for the reconstruction of the water supply on the street. District in the city of Kalush, Ivano-Frankivsk region, namely, the replacement of a steel pipe with a diameter of 500 mm for a polyethylene pipe with a diameter of 500 mm from well No. 1 at the exit from the emergency department of the II-th ascent to well No. 2 behind the bridge over the Sivka River on St. District. It is planned to insert the designed water pipe into the existing steel water pipe with a diameter of 500 mm after the well with the metering unit on the territory of the Emergency Service and in the well behind the bridge over the Sivka River. Fire hydrants are planned to be installed along the water pipeline route in accordance with the requirements. The water pipeline is designed to improve water supply, as the existing steel water pipeline is in an emergency condition. For laying, similar to the existing steel water pipeline, polyethylene pipes (PE 100) with a diameter of 500x29.7 mm are provided in the area from the existing well No. 1, which is located on the territory of the VNS II-th rise to the existing well behind the bridge over the Sivka River. The implementation of the project will make it possible to improve the water supply residential buildings of the old part of the city, including economic entities, to ensure an increase in the number of consumers, to receive high-quality water supply services on a continuous basis, as well as reduce the risks of emergency situations and minimize the negative impact on the environment. It is also planned to design a water supply network from the existing water supply to provide high-quality drinking water to the villages of Piylo, Holyn, Sivka Kaluska.    

"Overhaul with thermal modernization of Kalush Lyceum No. 10 on Yevshana St., 17 in the city of Kalush, Ivano-Frankivsk region"

The total amount of the project is UAH 19,054.651 thousand, of which UAH 17,125.551 thousand - DFRR funds and UAH 1,929,100,000 - from the budget of the Kalush City Community. The main problem that will be solved by the implementation of the project is due to the currently extremely urgent need to carry out major repairs and thermal modernization of the Lyceum building. The project is focused on improving proper and safe conditions for children's education and providing quality educational services for students of the Kalush Lyceum No. 10. Ensuring the proper stay of children and staff in the premises of the institution will contribute to the improvement of the educational process. And the arrangement of a sports ground on the territory of the lyceum will allow students to safely and comfortably engage in physical culture and game sports. Providing and carrying out appropriate measures to improve the energy efficiency of the building will lead to a decrease in energy consumption and improve the technical condition of the building. The project has a socio-economic focus. The social effect will be achieved by bringing the condition of the lyceum building to the appropriate sanitary and hygienic requirements, increasing the comfort level of the stay of children and administrative and pedagogical staff in the educational institution, and improving their health. The economic effect is expected from the use of energy-saving materials and, as a result, the effective use of budget funds for the payment of energy carriers and cost savings for current repairs.      

"General education school of grades I-III in the village of Bodnariv, Kaluska district, Ivano-Frankivsk region. Adjustment of estimate documentation"

The total amount of the project is UAH 109,923.509 thousand, of which UAH 98,821.235 thousand - DFRR funds and UAH 11,102,274,000 - from the budget of the Kalush city community. The relevance of the project is the creation of appropriate material, household, sanitary and hygienic conditions for children through the construction of a new modern innovative school. For many years, an acute problem of the village Bodnariv remains to build a school. The premises of the school, which is the main building, built in 1939 and once used as a dairy, in its essence cannot be a school. The general education institution is located in poorly adapted premises, which do not meet sanitary and hygienic standards in terms of the number and area of ​​the premises, the level of natural lighting. The walls are affected by fungus, besides; there is no gym and assembly hall. After the completion of the project, the new Bodnariv School (Bodnariv Lyceum) is planned to be used as a supporting educational institution. In the future, it is expected to be visited by students from the village of Bodnariv and seven surrounding villages: Bryn and Vysochanka of the Halych territorial community, Maidan and Nova Huta of the Yamnytska territorial community, Vistova, Rip'yanka and Mysliv of the Kalush territorial community (project capacity of the institution is 600 students). The school building includes a block of elementary classes, classrooms and classrooms, laboratories, educational and production workshops and physical culture and sports premises, a library, an assembly hall with auxiliary premises, a food block, a first aid station, and administrative premises. The implementation of the project has an important socio-economic significance. It is focused on improving proper and safe learning conditions for children, providing high-quality educational services for students of the I-III levels of secondary school in the village of Bodnariv (Bodnariv Lyceum of the Kalush City Council). Ensuring proper stay of children and staff in the premises of the school will significantly contribute to improving their health. Ensuring and carrying out appropriate measures regarding the energy efficiency of the building will lead to a decrease in energy consumption.